Drawstring Reducer Yee PVC Pipe Fitting Mold for Drainage

Drawstring Reducer Yee PVC Pipe Fitting Mold for Drainage

G-PLAS PRECISION MACHINERY TO MAKING PET PREFORM MOLD HAVE BEEN 30 YEARS IN NINGBO ZHEJIANG CHINA. PVC 90°Degree Elbow D
Basic Info.
Model NO. GP-PVC DYEE1
Cavity Quantity 2
Certification CE
Customized Non-Customized
After-sales Service Engineers Available to Service Machinery Oversea
Transport Package Wooden Case
Specification 1000kg
Trademark G-PLAS
Origin China
HS Code 8480719090
Production Capacity 30
Product Description
G-PLAS PRECISION MACHINERY TO MAKING PET PREFORM MOLD HAVE BEEN 30 YEARS IN NINGBO ZHEJIANG CHINA.
PVC 90°Degree Elbow Drainage and Sewerage Pipe Fitting Mould is used to manufacture PVC elbow pipe fittings, which are suitable for engineering, home decoration, drainage ,sewage disposal and so on We are a professional design, manufacture PVC mould manufacturer. 15 years of experience in mould and injection moulding.
PVC pipe fitting mould photos

Drawstring Reducer Yee PVC Pipe Fitting Mold for Drainage



Drawstring Reducer Yee PVC Pipe Fitting Mold for Drainage

Drawstring Reducer Yee PVC Pipe Fitting Mold for Drainage

Drawstring Reducer Yee PVC Pipe Fitting Mold for Drainage









Note:Above specifications are subject to change without prior notice.Dimesion means Height x Width x Thickness

Name Description
Products' info we need to make quotationClear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#,50#,P20,H13,718,2738,NAk80,S136,SKd61 etc
Mould Base LKM,HASCO ect .
Cavity Multi
Runner Hot/cold
Mould Design3D/2D Drawing
Design Days 3 days
Design Software UG,PROE,CAD,CAE,CAM,CAXA ect
Plastic MaterialPP,PC,PS,PE,PU,PVC,ABS,PMMA ect
Mould Life 300,000-3,000,000 shots
Injection SystemPin-point-gate
Polish SystemMirror Polish
Payment30% of Deposit by T/T,70% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step
1.R&DWe support customer R&D. Make the files or improve the design if you needed
↓↓↓
2.Quotation MakingMould Quotation will be finished in 1 day according to information we get
↓↓↓
3.Negotiation The quality ,price ,material,delivery time .payment item.ect
↓↓↓
4.Mould Design 3-5 days for mould and product 3D/2D drawing design
↓↓↓
5.MouldAccording to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 25-60 days
↓↓↓
6.Mould TestingWhen moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference.
↓↓↓
7.Sample shoot If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory
↓↓↓
8.Delivery Delivery goods by sea or by air ,according customers requirement

spare parts follow machine and working CNC MACHINE
SHIPPING LINE FROM FACTORY NINGBO TO OVERSEA
FAQ
Q1: Are you a factory or trading company?
A: We are a factory .
Q2: Where is your factory located?
A: Our factory,near Shanghai, located in Ningbo,China
Q3: what is your trade term?
A: normally FOB NINGBO, if customer country requires, also can accept L/C at sight.
Q4: what is your payment term?
A:50% down payment against order confirmation, 50% balance payment prior shipment.
Q5: Have blow machine 100% assemnled well in stock?
A: No. All blow machine will be assembly produced according to your order.
Q6: what is your delivery time?
A: usually in 60days, depends on your projects.
Q7: what about installing in customer factory?
A: after machine arrived at your factory, please prepare water, electric,air and preform, then we will arrange engineer to install machine and train your workers, the longest time to free install shall be in one week, you should afford engineer air tickets, food, hotel,transport.
Q8:guarantee time?
A: one guarantee, not man-made.